Michael McCabe

Mid Term Progress Report

10/20/05

 

Up to this point in the semester IÕve been a bit to busy to keep up with my regular progress reports.  HereÕs a short list of the things IÕve done.

 

 

á      Installing Xen Workshop

á      Writing Good Bug Reports Tutorial

á      Using Static Code Analysis Tools

á      Brought up Mirror

á      Brought up Waldorf

á      Brought up Statler

á      Installed Xen on Animal

á      Moved the lab build system to a Xen guest

á      Assisted at the Open House

á      Participated in the IBM Mainframe Contest

á      Signed up for the OSDL Contest and started working on it

á      Installed the new servers and Rackmount units